1980 |
Registered
as a Private Limited Firm with the name of
Design
Development Fabrication Company (DDFC).
Set
up a modest fabrication unit at a rented premises
in
Shadbagh, Lahore.
|
| 1982 |
Shifted
Workshop to self-owned property at Kot
Lakhpat
Industrial Estate, Lahore
|
1984 |
Started
hygienic grade fabrication for Food Processing
&
Pharmaceutical Industries. The following equipment  was
added for this: Dish end forming & Flanging
Machine,
Automatic Seam Welding machines &
Distortion
Removing Machine.
|
1985 |
Developed
machine for polishing Stainless Steel Tanks
|
| 1986 |
Developed
direct expansion electric motor & diesel
engine
driven Milk Chilling Units.
|
| 1989 |
Licensing
agreement with Beel Industrial Boilers Plc,
U.K.
for Packaged Smoke Tube Fired & Waste Heat
Recovery
Boilers.
Technical
Collaboration with M/s. Dontare Ltd., U.K. for
Water
& Waste Water Treatment Plants.
|
| 1992 |
Design
and construction of first Waste Water
Treatment
Plant undertaken for ICI Polyester,
Sheikhupura.
First
Fired Boiler manufactured.
Technical
collaboration with M/s. Lurgi GmbH, Germany
for
Solvent Extraction Plants.
|
| 1995 |
First
Waste Heat Recovery Boiler manufactured.
|
| 1997 |
Re-incorporated
as DDFC (Pvt.) Ltd.
|
| 1998 |
Obtained
the ISO 9001:1994 Quality Management
certification.
Technical
collaboration with M/s. Aalborg Industries,
Sweden
for Water Tube Waste Heat Recover Boilers.
Technical
Collaboration with M/s. Hobur Twente B.V.,
Netherlands
for design & fabrication of LPG Bowsers
|
| 2001 |
Certified
to the revised ISO 9001:2000 Quality
Management
standard.
Developed
in-house basic design capability for Fired &
Waste
Heat Recovery Boilers
|
| 2003 |
First
project in Oil & Gas Sector received from M/s OMV
for
Qadanwari site.
Joint
Venture with M/s. Ranhill, Malaysia.
Shifted
from Kot Lakhpat to expanded Engineering
Works,
Multan Road , Lahore.
Acquired
ASME 'S' & 'U' stamps certification
|
| 2004 |
Received
first major project requiring ASME stamped
vessels
in Oil & Gas sector with M/s. Ranhill from M/s.
PPL
for expansion of their LPG / NGL gas field.
Exported
largest Fired Boiler of 31 TPH @ 12 Bars (g)
with
twin furnaces.
|
| 2005 |
Exported
5 TPH @ 10 Bars (g) Fired Boiler, S.S. Syrup
tanks
and Waste Water Treatment Plant to Kabul,
Afghanistan.
|
| 2006 |
Received
order from OGDCL for Three Phase Separator
in
collaboration with M/S Challanger Process System
-USA.
|
| |
Acquired
National Board ‘R’ stamp certification
|
2008 |
Gas
Filter Separators (ASME "U" Stamped) developed
first time in Pakistan in collaboration with Perrry
Equipment Corporation (PECO) USA, delivered to Sui Northern
Gas Pipelines Ltd (SNGPL), Pkistan.
|